Plan your day on the timetable
Timetable is the grid your week is laid out on. Down the left of it sit your
open tasks, your
routines and the colours you paint
time with, so the whole plan-the-day loop happens on one screen.
The grid runs from 8am to 10pm and stretches to fit anything outside that, so a 9:30pm appointment is never squashed off the bottom.
Block out a time
Section titled “Block out a time”Click an empty stretch of the grid and a box opens there asking what you’ll do. Type it, press Enter, and the block is on the calendar.
For everything a block can carry, open it and use the full window instead:
- Click the block to open
Edit time block. For a new block, pressBlockunder the grid, or drag across a stretch of time, to openNew time block. - Name it, such as
Cold calling block. - Pick a colour from the pills.
- Set
Repeats,StartandEnd. - Add checklist items if the block has steps.
Repeats is Once, Weekly, Every day, 2-weekly or Monthly. The four
buttons under the times set the length in one tap: 30m, 1h, 1h30 and 2h.
On a phone, New block opens a sheet on the day you’re looking at, with What will you do?, a start time you nudge by 30 minutes at a time, and a length of
30m, 1h or 2h.
Paint with colours
Section titled “Paint with colours”The colours come from the Time blocks card in the left rail. Five arrive with
the app: Prospecting, Preparation, Me time, Learning and Study.
Tap a colour and the card heading changes to Painting and its name. Your next
tap on the grid paints one hour-long block in it, then the brush drops.
Double-click a colour to keep painting. Press Escape to stop.
+ Add makes a colour of your own. Making one doesn’t arm the brush. Tap the new
colour when you want to paint with it.
Drag a task or a routine onto it
Section titled “Drag a task or a routine onto it”The rail shows your Tasks list, and up to 8 routines as chips. A routine already placed on the day you’re looking at drops off the chips.
Drag a chip onto the grid, or tap it and then tap a time. Tapping puts a banner across the top naming the day it’s waiting for and the block it will make, which is 30 minutes.
All routines → opens the
full routines page, because the
rail caps at 8.
Let Plan my day fill the gaps
Section titled “Let Plan my day fill the gaps”Plan reads your open tasks and packs them into the free time inside your
working hours, highest scoring first.
- Press
Plan. - Set
Work hoursandMin chunk. - Turn the weekday letters on or off.
- Read the proposal, day by day.
- Press
Placeand the number of blocks.
Work hours starts at 9 to 6 and Min chunk at 30 minutes, with 15, 45 and 60
also on offer. Monday to Friday are on to begin with. The plan reaches 7 days
ahead.
No-due too is off, so a task with no due date stays out of the plan and your
Someday list stays free. Turn it on and those tasks are fair game.
Replan recalculates from now. It sweeps the auto-planned blocks you haven’t
ticked off yet and packs around whatever has changed, and the window says how
many it will replace. A block you placed by hand is never touched.
Lines at the bottom tell you how it went. All tasks are scheduled on time.
means everything fitted. An amber line counts tasks that land after their due
date. A red line starting Won't fit this week: names the tasks it couldn’t
place, the minutes each still needs, and why.
When there’s nothing to do, the window says Nothing to schedule. If tasks were
left out only for having no due date, it counts them and tells you to turn on
No-due too. Otherwise, open the info mark beside it for the reasons.
Change what the grid shows
Section titled “Change what the grid shows”The button on the right of the toolbar names the view you’re in. Open it for the rest.
View is Day, Week or Month. Days in view is 1d, 3d, 5d or 7d, and the
info mark beside it explains that 3d follows the day you’ve selected and 5d means
weekdays. Density is Compact, Normal or Roomy, which is how tall one hour
draws. Time format swaps between 1:00pm and 13:00.
Hide tasks gives the calendar the whole width and Show tasks brings the rail
back. Split puts tasks beside the schedule outside the planner, and AI opens
a chat column on the right.
Show your real meetings
Section titled “Show your real meetings”Connecting a calendar
puts your bookings and
Google Calendar events
on the same grid, read-only. Bookings show in green, and each Google calendar in
its own colour. Plan my day then schedules around them instead of over them.
Press Connect on the banner, or Connect Pick a Time in the calendar menu. An
event you click opens its details with Join meeting when there’s a link, and
Manage in Pick a Time or Open Google Calendar to change it at the source.
Switch account connects a different Pick a Time account.
Can I edit a meeting that came from my calendar?
No. Synced events are read-only here. Change them in Pick a Time or in Google Calendar and the grid catches up.
Why did Plan my day skip a task I need done?
It leaves a task out when:
- it has no due date and
No-due toois off - it’s waiting on another open task
- you’ve given it a block by hand and it has no time estimate left to plan
- auto-scheduling is switched off on the task
- it’s a subtask, because the parent task is planned instead
- you pressed the × on it in this plan
Where does a block I place from Plan go afterwards?
Onto the grid as an ordinary one-off block, linked to its task. Tick it off and
the next Replan leaves it alone.
Does the timetable repeat every week?
Only blocks you set to repeat, and routines you place, which repeat on the
routine’s own schedule. Once is the default in the window, so a block stays on
the day you made it unless you say otherwise.