Updated 9 min read

Sales performance review: run it from the record

Most sales reviews are built on the last three weeks and the one deal everyone remembers. Here's how to run a quarterly review from the whole quarter's record: what to prepare, a 45-minute agenda, questions to copy, how to handle a low performer and a top one, and what to write down.

What a sales performance review is for

A sales performance review is a longer, more formal conversation with each rep, usually every quarter, about how they did, why, and what they'll work on next. It's different from a weekly 1:1, which deals with this week's deals and one skill. The review steps back and looks at the whole quarter.

It has two jobs. The first is an honest record: the rep's numbers against target, the skills that moved and the ones that didn't. The second is a plan for the next quarter that both of you agree to. A review that only does the first is a report card, and one that only does the second is a pep talk.

Most reviews manage neither. Gallup found that only 14% of employees strongly agree the performance reviews they receive inspire them to improve, 29% that they're fair and 26% that they're accurate. Its fix has three parts: start from what the rep achieved, make the review fair and accurate, and spend part of it on how they want to grow.

The usual problem is memory. You remember the big deal from last month and the bad week in the middle of it, and you forget the steady first eight weeks, and so does the rep. The fix is to run the review from the record.

How often to review

The quarterly review sits inside a rhythm. It's the step back, and it only works if the shorter conversations are happening too.

How oftenWhatHow long
Weekly1:1: this week's deals and one skill20 to 30 minutes
MonthlyThe numbers against target, on your own15 minutes
QuarterlyThe review in this post45 minutes
YearlyPay, role and the year ahead, if your company runs oneAn hour

A year is too long to wait. Gallup recommends progress reviews at least every six months, and found 48% of employees are reviewed once a year and 26% less often than that. The CIPD's performance management factsheet describes the same move, away from the annual appraisal and towards regular conversations about progress. A quarter is short enough that the rep still remembers the deals, and long enough for a skill to show in the numbers.

What to prepare

Spend 30 to 45 minutes per rep, a few days before. Pull these together on one page:

  1. The results: deals won and revenue against target, and quota attainment for the quarter.
  2. The activity: calls or conversations, first meetings and proposals, week by week. A week-by-week view shows whether a slow result came from a slow month or a steady decline.
  3. The rates: first meeting to proposal, proposal to won. The win rate calculator works out the last one by count and by value.
  4. The pipeline: what's open now and what it's worth, and how it compares with the start of the quarter.
  5. The coaching record: the skills you worked on in 1:1s, the actions agreed, and whether the numbers moved.
  6. Anything outside the numbers: helping a new rep, a big client saved, a difficult quarter at home.

The last item matters more than it looks. The CIPD splits performance three ways: doing the core job well, helping beyond it (its example is helping other teams reach their targets), and adapting when things change. Your sales numbers show the first, so ask the rep about the other two.

Send the rep a short version two days before, with three questions to think about. A rep who's seen the numbers first doesn't spend the meeting defending them.

If you keep a weekly sales report or a sales scorecard for each rep, the quarter's sheets are most of your prep.

The review is easy when the quarter's 1:1s are written down. ActivityTracker keeps every session's notes on the rep's page, and sends action items into their task list.

See coaching in ActivityTracker

A 45-minute agenda

MinutesWhatWho talks most
0 to 5What this meeting is for, and what happens afterYou
5 to 15The rep's own view of the quarterThe rep
15 to 25The numbers, togetherBoth
25 to 35What worked, what got in the wayThe rep, then you
35 to 42Next quarter: one or two goals, one skill, what they need from youBoth
42 to 45What you'll write down, and when they'll see itYou

Let the rep go first. Their view tells you whether you see the quarter the same way, which is the most useful thing you'll learn in the meeting.

Questions to ask

Looking back

- What are you proudest of this quarter?

- Which deal taught you the most, and what did it teach you?

- Where did the quarter go differently from what you expected?

The numbers

- Looking at the week-by-week activity, what happened in [week where it dipped or jumped]?

- Your proposal-to-won rate was [x]. Does that match how the deals felt?

- What's in your pipeline now that you're most and least confident about?

What got in the way

- What took time this quarter that shouldn't have?

- What do you need from me that you didn't get?

Next quarter

- If you could get better at one thing by the end of next quarter, what would it be?

- What number would you set yourself, and why?

- What should I stop doing that isn't helping you?

Pick eight or nine of these and leave the rest, so there's room for the rep to talk.

Feedback lines to borrow

Good feedback in a review names a number or a deal, says what it means, and asks or agrees one thing. "Great quarter" and "needs to improve" do none of that. Some lines to adapt:

What went well

- Your proposal-to-won rate held at 1 in 3 all quarter, the same as your best quarter last year. Keep running the review call the way you do.

- You booked a first meeting from four of the five referrals you asked for. Ask for more of them.

- You took Dan on six of your calls in his first month, and two of his first deals came from what he heard there.

What needs to change

- Your calls dropped from 25 a week to 12 after week eight. What happened?

- Eleven of your eighteen open proposals have no next date. Let's put one on each before Friday.

- You win the deals you qualify. The ones that stall skipped the question about who else decides.

The plan

- By the end of next quarter, I'd like to see 25 calls a week, every week. We'll check it in our Friday 1:1.

- What do you need from me to make that happen?

Set next quarter's goal together

The research disagrees on who should set the number. Gallup found only three in ten employees strongly agree their manager involves them in setting goals, and those who are involved are four times as likely to be engaged as everyone else. The CIPD says it isn't generally better for employees to set their own goals, and that what matters is that they're committed to them.

Both fit one meeting. Ask the rep what number they'd set and why, then agree the final number together, and keep the last word if you're far apart. Make it a number and a behaviour: "12 contracts, from 25 calls a week" gives the rep something to do. Then one skill, and a date to check both.

Reviewing a low performer

Start from the record, and ask before you tell. "Your first meetings dropped from about five a week to two after week six. What happened?" gets you a real answer. "You've had a bad quarter" gets you a defence.

Separate activity from skill. If the activity is low, the conversation is about what's getting in the way of the calls. If activity is fine and results are low, it's a skill, and the weakest rate tells you which one.

Be clear about what has to change, by when, and how you'll both know. "Five first meetings a week, every week, for the next six weeks, checked in our Friday 1:1" is clear. "We need to see improvement" isn't.

If it's gone past coaching and into a formal plan, follow your company's HR rules and say so plainly. The performance improvement plan template gives the plan its shape. Don't let the rep find out in the next review.

Reviewing a top performer

Top reps get the shortest reviews, and it's a mistake. They're the ones with the most options elsewhere.

Ask what they want next: a bigger territory, harder deals, mentoring a new rep, a path to managing. Ask what's getting in their way, because top reps often lose hours to admin you can fix. And still pick one skill to work on. A rep who's already the best on the team still has a next level, and working on it tells them you're paying attention.

Reviewing a new rep

A rep in their first 90 days isn't on the full target yet, so review them against the ramp you agreed when they started. For example: their own calls every day by week four, first meetings booked without help by week eight, and by week twelve a first deal or a pipeline that will produce one. Ask what they understand now that they didn't in week one, and what they're still guessing at. Sales rep onboarding has the 30-day plan and what to expect from day 31 to day 90.

Reviewing yourself, if you sell on your own

If you sell your own services, nobody books your review, so put it in the calendar for the first week of each quarter and run the same agenda alone, from the same numbers. Answer the questions in writing, because writing makes you finish the sentence. Then pick one thing for next quarter and tell someone, a peer or a partner, who'll ask you about it in six weeks.

The hardest question to answer honestly is about time: what took your hours this quarter and didn't bring in any money?

What to write down

Write a one-page summary within two days and send it to the rep. Keep it to:

  • The quarter's numbers against target.
  • Two or three things that went well, with an example each.
  • One or two things to change, with an example each.
  • Next quarter's goals, the one skill and what you'll do to help.
  • Anything the rep asked for, and your answer.

Ask the rep to reply with anything they see differently. Their reply goes in the file too. It's the first thing you open at the next review.

If your company asks for a rating on a scale, give it last, after the numbers and the plan, with one line of evidence beside it. A rating with no example is the part the rep argues with.

If your team is in Singapore, TAFEP's guidance on a fair performance management system asks employers to keep every performance review for at least one year, set up an internal way to appeal an appraisal, and not mark anyone down for using their statutory sick leave. For anything beyond that, follow your company's HR rules.

A made-up review

Made-up example: Nina sells IT support contracts. Her quarterly target was 12 contracts. She closed 10.

Prep: her week-by-week activity shows 25 to 30 calls a week for eight weeks, then 12 to 15 for the last five. Her proposal-to-won rate was 1 in 3, same as last quarter. Her manager's 1:1 notes show the drop started when she took over two big renewals from a rep who left.

Rep's view: Nina thinks it was a bad quarter. She hadn't connected the drop to the renewals.

Numbers together: her manager shows the week-by-week chart, and Nina explains that the renewals took most of each afternoon. They agree the renewals were real work that nobody counted.

Next quarter: target 12 contracts, 25 calls a week, and the renewals moved to the account manager. Skill: asking for referrals when a client renews, since she now has two happy ones.

Written summary sent two days later. Nina replies with one change: she wants to keep one of the renewals because she's close to the client. The numbers are invented.

What doesn't work

  • Reviewing from memory, where the last three weeks will always outweigh the first ten.
  • Surprises. If the review is the first time a rep hears about a problem, the 1:1s weren't doing their job.
  • Talking about pay and development in the same breath. The rep will only hear the pay. Hold them apart if you can.
  • A long list of things to fix. One or two, with dates.
  • Rating everyone "meets expectations" to avoid a hard conversation.

Keep reading

Questions people ask

Sources

Review the whole quarter.

The record remembers what you don't.

Book a walkthrough

30 minutes. You choose the day and the time.